Our team was engaged in designing a crucial reconstruction for the Jordan Creek interchange. The project included reconfiguring the on-ramp and off-ramp systems, ensuring smooth traffic flow for 60,000 vehicles per day. We completed the project with a separate pedestrian bridge equipped with a spiral ramp to enable safe and separate utilization by bicyclists, joggers, pedestrians, and mobility-limited individuals.

 

Abaci played a crucial role in the project, completing the high precision control surveying and construction stake-out to guide the construction crews. Our Professional Land Surveyors and skilled technicians utilized cutting-edge VRS-GPS and robotic surveying technology. This enabled us to translate the plan information from paper to ground in a clear and precise fashion to ensure the contractors had timely, understandable, and highly reliable information.